
EMC / EMI testing
Electromagnetic compatibility and emissions testing conducted in-house.
Eight SMT assembly lines, a ten-stage QA pipeline, full MES traceability and an in-house test lab — the substance behind every circuit board assembly we ship.

Eight high-speed full-auto SMT lines (Panasonic/NPM), two wave-solder lines, five assembly lines, and two conformal-coating/UV lines with automatic spray application and automatic depaneling by milling-cutter router. Inline inspection includes SPI, AOI, X-ray, ICT, FCT, first-article (FAI) and RoHS testing.
Current figures supplied by the production team. Lead times depend on design readiness, material availability and the agreed test plan.
A disciplined build sequence from incoming goods to outgoing dispatch — every stage documented, not assumed.
Every component batch is received, identified and verified against the BOM before it touches the production floor: resistors are tested for value on bridge-type equipment, chips get a microscope check plus a functional pass on dedicated test fixtures, and modules, diodes and transistors are checked against original-factory inspection reports. Reels are uniquely coded in the MES at this stage.
Eight SPI units run inline, checking solder paste after printing. Paste volume, offset and coverage are measured on every pad; boards that fall outside tolerance are held before component placement begins.
Eight AOI units — including two dedicated 3D units — cover solder-paste and post-placement inspection, scanning the full SMT panel for missing parts, polarity errors and solder-joint defects. Results are logged to the MES before the board enters reflow.
Boards run through Heller (13-zone) and JT (10-zone) reflow ovens, with nitrogen reflow available and support down to 01005 passives and BGA/QFN packages. After reflow, boards are re-inspected, and an AI material-change check cross-references every feeder lane against the MES — if the loaded component does not match the BOM, the line stops before the next board runs.
X-ray runs through SMT and DIP stages for BGA void inspection and other hidden-joint packages like QFN. Solder-ball formation and void levels are verified where visual inspection cannot reach.
A dedicated hold point at the SMT stage boundary — reflow oven temperature profiles are verified every shift and at every line changeover, and moisture-sensitive components are vacuum-packed with shelf-life tracked. The build cannot advance until SMT-LQC sign-off is recorded in the MES — the check is mandatory, not assumed.
The equivalent mandatory gate for through-hole assembly. Any reworked board is logged under a documented repair code and gets a second inspection pass before it moves on; every board holds at DIP-LQC until the check is clean.
Full visual inspection of the assembled board, then in-circuit test (ICT) and functional test (FCT) fixtures run to your specification. Faults surface here, on our bench, not yours.
A final documented quality gate: test records, inspection notes and first-article sign-off are gathered before packing begins. Any customer complaint after delivery runs through a documented 8D process.
Boards packed ESD-safe for international shipment and sent against a confirmed delivery date, each carrying a unique traceability code. Shipment reports can be pulled in one click, so the build remains auditable after it leaves us.
Our Manufacturing Execution System tracks the build at component level, from goods-in to dispatch. Every reel is uniquely coded, scanned and database-matched before it reaches the line; every feeder lane is verified in the MES before each run begins. QR codes and turnover-box indexing link each board to its batch throughout production. A real-time kanban shows line efficiency, capacity and first-pass yield — live, not retrospective. Wrong-material prevention is enforced by the system: no reel goes on the line without a database match — a wrong part stops the line instead of reaching your board.

The test equipment sits in the same building as the production lines. Checks happen when they should — not whenever a third-party lab has a slot.

Electromagnetic compatibility and emissions testing conducted in-house.

Dielectric withstand voltage, ground continuity and insulation resistance — verified before shipment.

Extended load runs and stress testing to validate that design margins hold under real operating conditions.

Incoming component verification; constant-temperature and humidity chamber; oscilloscopes and precision measurement equipment on-site.
Every Faradine board is built in an IATF 16949 / ISO 9001-certified facility. The same facility holds ISO 14001 and ISO 45001 certification and is recognised as a national high-tech enterprise.




Send your files or your questions. A project manager will walk you through the process — and, where we can, share test records from comparable builds.